Journal Before You Book

What Pushes the Cost of Video Production Up or Down

It's almost never the camera. Video budgets are driven by time, people, and how many places the footage has to work.

Topic
Before You Book
Entry
010
Read
4 min
Published

"How much does a video cost?" is the first question most people ask, and it's the one the industry answers worst. That isn't because anyone's being cagey. The honest answer is that it depends on four or five specific things, and a lot of quotes jump straight to a number that doesn't survive once the real brief shows up.

So instead of a price list, here's what actually moves the number.

Shoot days

This is the big one. A half day at one location costs a fraction of two days across three sites. It isn't because the camera costs more per minute. Crew time, gear hire, travel and logistics all scale with days, not with how much footage ends up on screen.

Sometimes a lean approach is exactly right. The Wake Up It's Summer ad for Mojo Coffee was one day with a two-person crew, and that agility is what gave it the loose road-trip energy the brief wanted. A bigger crew would have made it slower and more polished, which wasn't the point.

Crew size

A single operator covering camera, sound and direction is efficient, but there's a limit to what one person can capture at the same time. Adding a second camera, a sound recordist or a gaffer (the person in charge of lighting) buys you coverage and control. It isn't extravagance. It's more things done properly at once.

If your shoot has a moment that only happens once, like a speech, a reveal or a live event, that's usually when a second person pays for themselves.

Post-production

This is the part most people underestimate. A single 90-second edit is one job. The same footage cut six ways, for different platforms, lengths and aspect ratios, with captions, colour grading and motion graphics, is a much bigger one.

In most people's heads the cost sits on the shoot day. In practice, editing, colour and revisions often take as long as the filming, sometimes longer.

A cinema camera doesn't cost more to point at something. Time does.

Where to spend and where to save

If your budget is tight, the smartest place to protect is pre-production. A clear brief, a shot list and a bit of location scouting cost very little compared with what they save on the day. They cut out wasted setups, second-guessing and reshoots.

The place budgets most often run away is revisions after the edit is basically finished. Every extra round takes real time. The most expensive pattern I see is five people reviewing separately and sending notes on different days, which turns one round of changes into five. Get everyone who needs to sign off in the same document, once.

How to have a useful budget conversation

Rather than opening with "how much for a video", start with the shape of the project:

  1. Name the main use. One hero video, a campaign, and an ongoing monthly content need all cost differently.
  2. Count the deliverables. Not "a video" but the actual list: the main edit, cutdowns, vertical versions, captioned versions.
  3. Explain your review process. How many people need to approve it, and in what order?
  4. Leave a small buffer. Not for disasters, but for the ordinary extra half day most projects end up needing.
  5. Ask for a breakdown. A quote split into pre-production, shoot days and post-production shows you what you're paying for and where there's room to move if the budget needs to change.

A note on day rates

A day rate on its own tells you very little. Two videographers with the same day rate can produce very different totals depending on how they plan, how much editing time they allow and how many revision rounds are included. Compare full quotes against the same list of deliverables, not rates.

The number that worries people at the start is rarely the real problem. An unclear scope usually is. I'd much rather sit down and walk through what's driving the cost of a specific project than hand over a flat rate that falls apart the moment the real brief arrives. If you want to see how different projects compare, the work page has everything from single-operator shoots to full crew productions.

In short

Shoot days, crew size and post-production drive most of the cost, not the equipment. Protect your pre-production budget, keep feedback to one consolidated round, and ask for a quote broken into planning, shooting and editing.

Have a project in mind? Let’s talk →

Related work